Today I had an hour or so to work on the tub so I started laying out some tile. Once I made sure everything was level (or as close as the tub would let it be), I mixed up a small batch of thinset and grabbed a handful of tiles. The first row is always the hardest since it sets the rest of the wall. I tried to take my time. It was almost too long because the thinset started setting up near the end of the row. Gotta get the molasses out next time. Anyway, it's not even dry but here's a pic.
No comments:
Post a Comment